Jump to content

Duties and Components within the Domino Mechanism of the WSD World Succession Deed

Duties and Components within the Domino Mechanism of the WSD World Succession Deed

   Structural Obligations and Network Linkages Defining the WSD Succession Framework[1][2]

“Duties”

According to the fundamental principle of international and comparative property law res transit cum suo onere (the thing passes together with its encumbrance), the transfer of rights is inseparably linked to the transfer of obligations. This principle, while rooted in Roman law, finds continuous reflection in modern doctrines of state succession and treaty law [3].

Within the architecture of the World Succession Deed 1400/98, the inclusion of duties is neither incidental nor merely declaratory. It ensures the juridical completeness of the transfer and prevents any characterization of the transaction as a partial or defective succession.

The duties assumed by the Buyer include, inter alia:

  • Obligations arising from the NATO Status of Forces Agreement and its supplementary arrangements, insofar as they were functionally and legally attached to the Turenne Barracks at the time of sale [4].
  • Environmental obligations relating to land use, contamination, remediation, and infrastructure maintenance, as required under applicable international and transboundary environmental regimes [5].
  • Most significantly, the obligations arising from the integration into global technical and regulatory networks, including those governed by specialized international regimes such as the International Telecommunication Union and the broader United Nations system [6].

By entering into these obligations, the Buyer did not merely replace the prior duty-bearers. Through the comprehensive nature of the succession and the subsequent consolidation of sovereign authority, the Buyer simultaneously became the ultimate interpreter, enforcer, and modifier of these obligations. In this construction, duties do not disappear; rather, they are internalized within a newly unified sovereign framework.

“Components”

The term “components” is to be interpreted in accordance with both ordinary meaning and established legal usage. It encompasses everything that, according to common understanding and juridical definition, belongs functionally and legally to the property.

This includes not only buildings, fixtures, and installations, but also the entire system of supply and disposal lines up to their respective points of connection. In the context of modern infrastructure-dependent property, these components constitute the operational essence of the site.

Within the Deed, components are not treated as accessory or secondary elements. Instead, they are elevated to a status of central legal relevance, precisely because they serve as the conduits through which the property is integrated into wider territorial, economic, and regulatory systems.

“Especially the Internal and External Development”

This formulation constitutes the LEGAL DETONATOR of the entire construction. By explicitly highlighting the development of the property, the Deed distinguishes between two analytically distinct but functionally inseparable dimensions:

Internal Development

Internal development comprises all lines, cables, installations, and facilities located within the boundaries of the Turenne Barracks. As detailed in the Deed, particularly in §13, this internal development forms a dense and interdependent technical network, including:

  • Telecommunications: telephone lines, broadband cable television systems, data transmission lines, copper and fiber-optic cabling, antenna and relay systems, and internal communication infrastructure, expressly referenced through the assumption of the TKS Telepost license agreement pursuant to §2 Abs. V No. 1.
  • Electricity: transformer stations, distribution cabinets, internal cabling, and load management systems, interconnected with external grids as regulated under §12 Abs. III.
  • Water and Wastewater: potable water pipelines, pumping stations, sewage conduits, and interfaces with municipal treatment facilities.
  • Heating and Gas: district heating installations, gas connections, and distribution lines, including obligations to renovate and continue operation under §13 Abs. VII.
  • Transport Infrastructure: internal roads, pathways, and access routes necessary for the functional use of the property.

Each of these subsystems is internally coherent yet externally oriented. None can operate in isolation.

External Development

External development constitutes the DECISIVE LEVER of the domino effect. It refers to the legally and physically indispensable connections between the internal infrastructure and the public or supra-regional networks beyond the property boundaries.

In international legal terms, a property devoid of external connections is economically, socially, and legally inert. External development is therefore not ancillary but constitutive of value and function.

In the case of the Turenne Barracks, external development entailed connections to:

  • The German telecommunications network, operating within the regulatory framework of the ITU and the European telecommunications acquis. This network functioned as the primary vector of the domino effect, due to its inherently global reach [7].
  • The German electricity grid, and through it the European interconnected grid, governed by cross-border energy coordination regimes.
  • The regional and national gas network, including pre-existing pipeline rights expressly assumed under §1 Abs. II of the Deed.
  • The municipal water and wastewater systems, integrating the property into local and regional environmental management structures.
  • The public road network, including ancillary infrastructure such as street lighting and traffic access.

By making the entire development, and in particular the external development, the explicit object of the sale, the World Succession Deed 1400/98 transferred not merely physical pipes and cables. It transferred the right of connection itself.

From a juridical standpoint, a connection cannot exist independently of the network to which it connects. The network constitutes the condition of possibility for the connection. Consequently, the acquisition of the right of connection necessarily entails a legal effect upon the network as such.

Within the internal logic of the Deed, this effect is what enabled the transformation of localized infrastructural rights into a mechanism of global territorial expansion. The network, once affected, became the pathway through which sovereignty extended beyond the original site, activating the domino effect that defines the global reach of the Buyer’s authority [8].

Press reports on the "Kingdom of Kreuzberg"

German sources

Further contexts: Micronations and the Kreuzberg settlement

Spanish publications

References

World Sold

Electric Technocracy

Global Archive / Treaty Archive

WSD – World Succession Deed 1400/98

eBooks & PDF Downloads

Media: Video, Audio, Podcast

Start‑Pages & Portale

NotebookLM Chats

Micronations & Nation‑Building

Blacksite / Archive

UBI – Universal Basic Income

Videos – Nation Building & Micronations

Blogposts

Historische Dokumente

Social Media

X (Twitter)

Zenodo / DOI / Encyclopedia

Podcasts

Specialized Tools

Wikipedia

Investigative / Scandals

PCloud Vaults

References

  1. ↑ File:Turenne-Kaserne-Vertrag.pdf
  2. ↑ File:World-Sold-Non-fiction-Book-World-Succession-Deed.pdf
  3. ↑ Oppenheim’s International Law, Vol. I, 9th ed., §234
  4. ↑ NATO Status of Forces Agreement, 1951, Arts. II–VII
  5. ↑ Stockholm Declaration on the Human Environment, 1972, Principle 21
  6. ↑ International Telecommunication Union Constitution, Art. 4
  7. ↑ International Telecommunication Regulations, 1988
  8. ↑ Island of Palmas (Netherlands/United States), Permanent Court of Arbitration, 1928